What Customers say about Selecta Flooring?
Selecta Flooring, LLC does only real hardwood floors, no laminate, no engineered, and no gimmicks. We are very proud of the work we do that comes through in our finished product and the way we conduct ourselves during this process. If you are looking for a beautiful floor that will literally last a lifetime give us a call.
Selecta Flooring, LLC: Wood Floor Sanding & Refinishing in Livingston
Selecta Flooring, LLC
(908) 301-0150
“Quality of life”
The thing that drives Selecta Flooring, LLC employees is that no matter what we are working on, whether it’s a floor sanding and refinish , a new floor, or even a flight of stairs, when we walk away from a job we know we have improved the quality of life of a family or the image of a business with a floor that they will be proud to show their friends or customers.
Get a Price Quote cost for Livingston, NJ Wood Floor Sanding & Refinishing
“Not just business”
You will never hear us say, “it’s just business”. I believe the way to make a company grow is all about personal relationships, this is true for Selecta Flooring, LLC employees and of course our customers. Our company is made up of a tight knit group that works very well together, and we get work with our reputation rather than gimmicks. Over 80% of our business is word of mouth, so happy customers are very important to us.
Best Wood Floor Sanding & Refinishing in Livingston, New Jersey
SERVICES
Installing new floors
All new floors (whether raw wood or prefinished) are solid wood and each board is individually stapled down with 2″ staples, so once it’s in it is completely solid.
Floor Sanding and refinishing
Any floor we sand whether we just installed it or its 100 years old we start by getting it flat and all the old finish off. Once we have a good base to work with, we use a color matched full spread filler over the entire thing, which means all cracks and holes disappear. After Floor sanding the entire thing a few more times its ready to seal or stain. During the Floor sanding process all our equipment is on vacuums so there is almost no dust, about as much as you would get in a normal week, so sealing off the rest of the house is not necessary. The sealing process is what locks in the color you want, and it does have some smell, but it dries in about an hour and dissipates pretty fast.
Livingston Wood Floor Sanding & Refinishing Near Me
Once the color is locked in, the finish goes on. Each coat takes 3 hours to dry so we can normally get 2 coats on in one day. That night once the finish dries you can walk on it. If you want a third coat, we can do it the next morning and the floor is all yours that afternoon. With vacuums, good equipment and finish that dries quickly we can normally do all the work with you living in the house and with a little care you are able to walk on it every night (the only exception is if it is only sealed or stained you must have very clean dry socks on and just walk across it, no cooking etc…)
Affordable Nearby Wood Floor Sanding & Refinishing 07039
A lot of people don’t think you can put hardwood floors over radiant heat. This is absolutely not true. We do it all the time and have never had a problem. Actually, it works great because wood absorbs heat so once you get the floor warmed up, it radiates the heat very evenly. The only downside is there is some prep involved, if you have your tubes under your subfloor there is no prep we can nail directly to your 3/4″ plywood, but if you are using the type in concrete we will need to glue 3 / 4″ plywood or OSB to your floor then staple our hardwood to that. This can cause some height problems, especially against other types of flooring like tile, carpet or your stairs may be off, but with a little preplanning these are not huge problems.
Stairs
On a typical set of stairs, we start by stripping them down to the stair jacks and replace the treads by gluing down and nailing 3/4″-plywood. This way we can get all your steps to the right height and make sure everything is square and solid before we start. We are then able to fit new II/8th” solid treads and 3 / 4″ solid risers to this structure. Everything is glued so when it is done it is very solid. A normal set of stairs can be done in one day because we can refinish everything in our shop before we even start. We can do the prep, cut and fit everything, get it glued and nailed, touch it up, sand the entire thing by hand, then put a top coat of finish on as we leave. After three hours of drying it is all yours.